The focus of this project was to improve energy efficiency and keep many of the original design elements of the 50,000 sq. ft. old court house.
Both the HVAC system and lighting were upgraded and the building interior and storefront were redesigned to better utilize the existing space.
Project Highlights
- Engineering
- Lighting retrofit - 40%+ savings.
- HVAC upgrade - 20%+ gas savings.
- Retrofit the hydronic system.
- Upgrade existing HVAC.
- New duct work.
|