Canada Post - Hydronics Analysis

Canada Post wanted to know if the existing heating and cooling system would be able to support the upcoming building addition that is planned for mid-2011.
Project Highlights
- Review existing HVAC, heating and cooling system.
- Review existing piping layout.
- Review original design intent for system for flow and capacity.
- Measured flow, pressure drop, and pump performance.
- Generated final report of all findings and recommendations.
< Back to Past Projects